HEADLINES

Targeted diesel subsidy bold move to stem leakages: Nga

Local government minister says impact on cost of living was considered before the implementation of the subsidy

4:27 PM MYT

 

TELUK INTAN – The implementation of the targeted diesel subsidy in Peninsular Malaysia is a bold move by the Madani government to steam leakages, said Housing and Local Government Minister Nga Kor Ming.

He said the government led by Prime Minister Datuk Seri Anwar Ibrahim has considered various aspects to minimise the impact on the cost of living before deciding to implement this measure.

“If the government does not implement targeted subsidies, the leakages will continue and worsen over time. It is very important for us to correct past mistakes.

“The Madani government chooses to act responsibly to ensure the country’s sustainability. This implementation can also save RM4 billion annually, which can then be used for the benefit of the people,” he told reporters here today.

Earlier, Nga, who is also the MP for Teluk Intan, handed over aid of RM1,000 each to 240 students from 11 Sekolah Jenis Kebangsaan Tamil (SJKT) in the constituency.

Last night, Anwar announced that the cabinet had agreed to implement a targeted subsidy on diesel for users in the peninsula, involving 10 types of public transport vehicles and 23 types of goods transport vehicles under the subsidised diesel control system.

He said this means that bus operators, taxi drivers and fishermen will continue to be supported with subsidies or assistance, and the government has agreed to provide cash assistance to eligible individual diesel vehicle owners, including small farmers, padi farmers and petty traders.

According to the prime minister, the targeted diesel subsidy does not benefit the T20 group and 3.8 million foreigners, and the move will save the government an estimated RM4 billion previously enjoyed by these groups annually. – May 22, 2024

Topics

 

Popular

RM1.3bil raised, but MEX II left incomplete with only RM30mil in the bank

With construction stalled, government mulls takeover as MACC probes RM416 million in alleged false claims 

Malaysia pulls the plug on Kuwaiti Hornet deal after years of turbulence

RMAF walks away from costly, outdated aircraft amid rising concerns over integration, support, and long-term value

Mutiara LRT project kicks off as Penang’s six-year construction timeline begins

SRS Consortium receives notice to proceed with first civil works; RM13 billion project slated for completion by 2031

Related