HEADLINES

Cabin panel dislodged during landing on airasia flight, aircraft lands safely with no injuries

AirAsia said the aircraft had undergone all required maintenance checks prior to departure, including routine 36-hour inspections involving both visual and physical assessments, and had met all preflight safety requirements

5:09 PM MYT

 

KUALA LUMPUR – AirAsia has confirmed that no injuries were reported among passengers or crew following an incident involving flight AK720 from Singapore to Kuala Lumpur.

In a statement, the low-cost airline said the flight landed safely at Kuala Lumpur International Airport (KLIA) Terminal 2 at 10.22 pm on April 4, after a section of the hose from a cabin panel became loose and dislodged during the landing.

AirAsia said the aircraft had undergone all required maintenance checks prior to departure, including routine 36-hour inspections involving both visual and physical assessments, and had met all preflight safety requirements.

“AirAsia’s engineering team conducted a thorough inspection upon landing to ensure the affected panel was safe and properly secured,” it said.

AirAsia Malaysia general manager Datuk Captain Fareh Mazputra said the cabin crew responded promptly, in accordance with established safety procedures, ensuring the guests seated beneath the affected panel were attended to and comfortably relocated.

He noted that the aircraft landed safely and was immediately inspected, with the affected panel refitted and secured in line with strict safety standards.

“We apologise for any inconvenience caused and thank our guests for their understanding, as safety remains our absolute priority in every aspect of our operations,” he added. – April 8, 2026

Topics

 

Popular

Influencer who recited Quran at Batu Caves accused of sexual misconduct in Netherlands

Abdellatif Ouisa has targeted recently converted, underage Muslim women, alleges Dutch publication

Subsidised RON95: how cheap is Malaysia’s fuel compared to neighbours?

There has been a spate of viral videos showing vehicles from neighbouring countries such as Thailand and Singapore being filled with Malaysia's heavily subsidised RON95 petrol, indicating a blatant disregard for local laws.

Mutiara LRT project kicks off as Penang’s six-year construction timeline begins

SRS Consortium receives notice to proceed with first civil works; RM13 billion project slated for completion by 2031

Related