HEADLINES

20km snarl-up in Gua Musang as post-raya traffic crawls back to KL

Massive congestion along federal road as holidaymakers return from hometowns, cops expect delays to persist into Sunday night

9:05 PM MYT

 

KUALA LUMPUR – Traffic along the federal road in the Gua Musang district was congested for up to 20 kilometres today due to the surge in vehicles as people returned to the federal capital after the Hari Raya Aidilfitri holidays.

Gua Musang district police chief Supt Sik Choon Foo said the congestion occurred at the Gua Musang–Kuala Lipis border entry point from morning until 6.30 pm.

“The congestion stretches from Gua Musang town all the way to the Rantau Manis Rest and Service Area (R&R), covering a distance of around 15km to 20km.

“Police personnel are on the ground managing traffic dispersal and flow to ease movement,” he told Bernama.

He said vehicles were moving slowly and the heavy traffic was expected to continue into Sunday night.

Meanwhile, traffic flow along the Pasir Puteh-Terengganu route, including at the Tok Bali-Kuala Besut border checkpoint, was reported to be smooth but slow as of 6.30 pm today.

Pasir Puteh district police chief Supt Zaizul Rizal Zakaria said the volume of vehicles in both directions was expected to remain high into Sunday night.

“Traffic flow on all roads in Pasir Puteh heading towards the Terengganu border is generally smooth, except for minor congestion in the Wakaf Lichong area.

“If there are any complaints of congestion, our officers will carry out regular patrols, involving the traffic unit and mobile patrol vehicles,” he said. – April 5, 2025

Topics

 

Popular

Petronas staff to be shown the door to make up losses from Petros deal?

Source claims national O&G firm is expected to see 30% revenue loss once agreed formula for natural gas distribution in Sarawak is implemented

InDrive faces termination for flouting guidelines

It is the second Russian e-hailing app after Maxim to face ban by Land Public Transport Agency

Cleared for layoffs? AirAsia to retrench 20% of workforce in major cost-cutting move

This allegedly involves cabin services, cargo and logistics, engineering and maintenance, as well as the commercial division, according to Scoop’s source

Related