RM1.7 billion extension project to adopt Multi-Lane Free Flow system upon completion in 2029, aiming to improve traffic flow and regional connectivity in Klang Valley
The 6.4 km New Pantai Expressway Extension (NPE 2), fully funded by IJM Corporation, promises smoother, faster commutes and up to 25 minutes of travel time saved for motorists along the congested Bangsar–Pantai Dalam corridor
The 15km elevated highway project, linking Pantai Dalam to Jalan Istana, marks IJM Construction’s third billion-ringgit contract win this year as the company strengthens its foothold in major infrastructure and industrial developments
While concerns over drug-laced vapes grow, a blanket ban could backfire by wiping out businesses, threatening jobs, pushing trade underground amid weak enforcement and open tank loopholes
The Energy Commission has set a new average base tariff of 45.40 sen/kWh for RP4, slightly lower than before, bringing overall electricity costs down by up to 19% compared to the previous regulatory period