Kerja-kerja penyenggaraan dan penggantian aset di Loji Rawatan Air Sungai Selangor Fasa 1 (LRA SSP1) telah siap pada jam 7 malam tadi, justeru pengguna dijangka menerima bekalan air secara berperingkat mulai awal pagi ini.
A look at the events surrounding the stabbing of a 16-year-old student, with ongoing investigations into the suspect's motives and the role of online violence