HEADLINES

road closure

Besraya lane closure carried out in stages 10pm-6am until Nov 30

Road resurfacing, line marking works are being done in both directions, covering stretches between KM0.1 to KM21.9, KMB0.0 to KMB0.8, KMS0.0 to KMS2.2, KMP0.0 to KMP3.3

Several roads in KV closed from tomorrow to Thurs for Chinese president’s visit

Routes will be diverted or fully closed, 17 routes identified for temporary closures between 30 and 45 min

Sinkhole disrupts traffic on NKVE near Damansara

Emergency and partial left lane closed at KM18.6 southbound for safety, motorists advised to plan their journeys

LRT3: traffic diversion from July 31 to Aug 7 at Persiaran Bandar Utama due to works

This is due to road closures from 10pm to 6am daily to facilitate works, involves right-most lanes of LDP slip road-bound and BU2 to Sri Pentas

14 roads to be temporarily closed in KL for 17th YDPA’s installation on July 20

KL top cop says this is to allow royal guests to arrive on time, as it will be reopened immediately after they pass through

Popular

Solat Jumaat di pusat beli-belah: Zulkifli galak negeri lain turut serta

Menteri Agama Dr Zulkifli Hasan mengalu‑alukan negeri lain mencontohi Wilayah Persekutuan yang sudah mula laksana solat Jumaat di pusat beli‑belah, sambil merancang perluasan ke terminal, lapangan terbang dan R&R lebuh raya

Short-lived La Niña expected in early 2026, but stable weather to follow

MetMalaysia forecasts cool conditions and brief shifts in rainfall patterns before returning to normal

Govt has settled RM42bil of 1MDB debt, total obligations exceed RM50bil: Anwar

Anwar reveals over RM9 billion in remaining debt, with government funds covering the shortfall