◉ HEADLINES

THeta Edge Berhad

MRT Corp anugerah kontrak sistem LRT Laluan Mutiara Pulau Pinang bernilai RM3.03 bilion kepada usaha sama MRCB-Theta Edge

Pelantikan Kontraktor Turnkey Sistem menandakan fasa utama seterusnya bagi Laluan Mutiara Pulau Pinang, membolehkan reka bentuk sistem rel dilaksanakan seiring dengan kerja-kerja pembinaan sivil yang sedang berjala

MRT Corp awards RM3.03b Penang Mutiara Line systems contract to MRCB-Theta Edge JV

The appointment of the System Turnkey Contractor marks the next major phase of the Penang Mutiara Line, allowing railway systems design to progress in tandem with ongoing civil works

◉ Popular

UiTM student body launches ‘wear black’ protest against calls to admit non-Bumiputera 

This after doctors’ body MMA’s appeal to allow non-Malays into cardiothoracic surgery programme

Kerajaan pertimbang turun cukai jalan kenderaan diesel, kurangkan beban rakyat: Anwar

Anwar berkata beliau telah meminta Menteri Pengangkutan untuk mencari kaedah bagi memperincikan pelaksanaannya dalam masa terdekat

Govt will ensure youth access to jobs, no region is underserved – Tengku Zafrul

The Investment, Trade and Industry Minister said that graduates, however, would need to acquire dynamic skill sets, adapt to new job trends