◉ HEADLINES

MRT Corp

MRT Corp: Baik pulih Laluan Kajang diteruskan walaupun SMH Rail berdepan kelewatan

Tujuh daripada 58 set tren kini berada di SMH Rail, manakala 22 alat ganti dijangka hanya tiba pada 2027

MRT Corp: Kajang Line overhaul to continue despite SMH Rail delays

Seven of 58 train sets are currently with SMH Rail, while 22 replacement parts are not expected until 2027

Bayaran berfasa sudah dibuat, mana trennya? Tujuh tren MRT laluan 1 masih ‘belum pulang’ selepas 2 tahun

Kontrak MRO SMH Rail bernilai hampir RM600 juta tertangguh, hanya 38 daripada 58 set tren masih beroperasi sepenuhnya

Staged payments made, but where are the trains? Seven MRT Line 1 trains still awaiting return after two years

Close to RM600 million SMH Rail MRO contract faces delays as only 38 of 58 train sets remain fully operational

MRT Corp anugerah kontrak sistem LRT Laluan Mutiara Pulau Pinang bernilai RM3.03 bilion kepada usaha sama MRCB-Theta Edge

Pelantikan Kontraktor Turnkey Sistem menandakan fasa utama seterusnya bagi Laluan Mutiara Pulau Pinang, membolehkan reka bentuk sistem rel dilaksanakan seiring dengan kerja-kerja pembinaan sivil yang sedang berjala

◉ Popular

Petronas staff to be shown the door to make up losses from Petros deal?

Source claims national O&G firm is expected to see 30% revenue loss once agreed formula for natural gas distribution in Sarawak is implemented

InDrive faces termination for flouting guidelines

It is the second Russian e-hailing app after Maxim to face ban by Land Public Transport Agency

Short-lived La Niña expected in early 2026, but stable weather to follow

MetMalaysia forecasts cool conditions and brief shifts in rainfall patterns before returning to normal