HEADLINES

ETS3

It’s a wrap: PM concludes Johor visit, heads home on ETS3

Datuk Seri Anwar Ibrahim spends quality family time in Johor, supporting state tourism and heritage initiatives

PM inspects ETS3 operations, makes surprise visit to Johor’s Zoo

Datuk Seri Anwar Ibrahim engages with passengers on the Electric Train Service 3 and reviews improvements at Zoo Johor during an unannounced visit

ETS service to reach Johor Bahru by mid-December

Transport Minister Anthony Loke says the southern extension of the intercity rail network will boost connectivity and tourism ahead of Visit Malaysia 2026

ETS3 ke Johor Bahru dijangka beroperasi pertengahan Disember: Anthony Loke

Kerja-kerja melibatkan aspek teknikal kini sedang disempurnakan dan berada pada fasa akhir persiapan

No delays, ETS3 to JB and LRT3 in Selangor ready by end 2025: Transport minister

With track infrastructure complete and only signalling works pending, the southern route of the Electric Train Service 3 is set to begin full operations by year-end, alongside the Klang–Petaling Jaya stretch of LRT3

Popular

Inside the Bandar Utama school tragedy: a timeline of the shocking fatal stabbing

A look at the events surrounding the stabbing of a 16-year-old student, with ongoing investigations into the suspect's motives and the role of online violence

SMART team leaves for Nepal, to focus on last known area of missing Malaysians

11-member team will be in disaster area for 10 days

Negeri Sembilan MB says he was pressured to sign document against Tuanku Muhriz

Ismail Lasim claims the proclamation failed to follow state constitutional procedures and is invalid